ARTSTONE
Home / Our solutions

Our solutions

A coordinated building.
A defined package.

ARTSTONE combines design coordination, factory-prepared concrete elements and engineered site assembly. Select a wall package, a modular building or finishing solutions for a conventional frame.

Illustrative ARTSTONE architectural or product concept
Architectural / product concept

Building and perimeter scopes

The right scope for your building.

SolutionWhat ARTSTONE providesProject interface
Foundation Series Ready-to-Fix WallsTwo distinct types: Fully Integrated Customized Walls, and Architecturally Finished Interlocking Wall Blocks.Structural or partition roles and connections follow the approved project design.
Precast Modular BuildingsStructural components, wall elements, selected finishes and agreed fabrication, joinery and building services.Foundations, site works, approvals and package boundaries are allocated in the project agreement.
High-rise FinishingFinished precast wall panels and agreed finishes to existing concrete frame elements.The main contractor builds the conventional frame; engineers coordinate panel loads, fixings and tolerances.
Fences, Compound Walls & GatesArchitecturally finished perimeter elements, fabricated gate assemblies and specified automation.Boundary layout, foundations, posts, openings, power and installation interfaces are resolved for the project.

The construction proposition

More coordination before production.

A building is a set of connected decisions. The layout determines openings and circulation. Architectural selections influence the surfaces and detailing. Electrical, plumbing and other systems need routes, access and connection points.

ARTSTONE brings these decisions into coordinated drawings and a defined scope before manufacturing. Factory finishing is intended to reduce repeated cutting, wet trades and finishing activity on site. Components still require engineered transport, lifting, connections and testing.

The project environment

A considered response to site challenges.

ChallengeARTSTONE approach
Weather and labour interruptionsControlled off-site production can progress alongside approved site preparation.
Variable workmanship and reworkApproved specifications, recorded production controls and factory inspections.
Fragmented tradesIntegrated review of structural elements, finishes and services.
Site-applied finish complexityArchitectural surfaces prepared before dispatch, with agreed site completion.
Waste and neighbourhood disruptionPrecision production, coordinated component deliveries and planned handling.
Changes and scope uncertaintyA defined package and documented review of changes before execution.

Construction by building type

Explore the configuration for your project.

Architectural concepts illustrate possible applications. Final configuration and scope follow the approved project design.

Logistics and site delivery

Component delivery is part of the design.

Review component dimensions, packing, route feasibility, site access, receiving areas, cranes and assembly sequence together. Restricted access is resolved before manufacturing release, with responsibilities and dispatch checks documented for the project.

Explore the logistics plan →

The next step

Let’s define your project.

Share your land details, intended use and priorities. We will discuss the appropriate package with you and your registered contractor.

Prepare your project brief ↗