Wall panels, fitted components and agreed architectural finishes for buildings whose primary concrete structure is built by the main contractor.

The structural interface
One project design across two scopes.
The main structural contractor constructs foundations, columns, beams, slabs and other primary elements using the approved conventional methods. ARTSTONE develops the agreed panel and finishing package.
Before manufacture, the structural engineer and ARTSTONE coordinate panel loads, anchors, openings, tolerances and installation interfaces. Application to a particular tower depends on engineering review and statutory approval.
Finished wall packages
Openings, surfaces and services.
The standard integrated high-rise partition wall is 15 cm thick and non-load-bearing, with a 4 cm concrete face on each side and joiners within the 7 cm central zone. Wall panel thickness can be customized to suit the building’s architectural requirements, with the final details coordinated in the approved project design. The conventional reinforced-concrete frame carries the primary building loads; ARTSTONE wall panels provide the agreed enclosure, partitions and architectural finishes.
Doors, windows and other specified fittings follow approved panel details. Kitchen and bathroom plumbing walls use customized panels with the thickness required to accommodate the pipework, fittings, service routes and access requirements. Their thickness is determined for the project rather than assumed to be 15 cm.
| High-rise wall application | Thickness | Role / coordination |
|---|---|---|
| Integrated wall panel | Standard 15 cm; customizable to architectural requirements | Non-load-bearing wall panel within the conventional structural frame. |
| Kitchen and bathroom plumbing wall | Customized to the required thickness | Designed around the plumbing, fittings, service routes and access requirements. |

Specialist site finishing
The same language across the building.
ARTSTONE’s specialist team can apply the specified architectural finishes to existing columns, beams, floor slabs, ceilings and stairs. Approved physical samples align these site-applied surfaces with the factory-finished wall palette.
Substrate inspection, preparation, protected work areas and the chosen material system determine the method. Façade joints, window perimeters, wet areas and service penetrations are resolved as part of the complete architectural environment.

Responsibilities
A coordinated finishing project.
| Activity | Main contractor / project engineer | ARTSTONE |
|---|---|---|
| Structural frame | Design and construct the conventional frame. | Coordinate panel loads and agreed interfaces. |
| Design coordination | Approve structural interfaces and statutory submissions. | Develop panel, finish and service details. |
| Site readiness | Survey the frame, provide access and release work fronts. | Review dimensions and readiness for ARTSTONE works. |
| Finishing package | Coordinate other trades and building-wide services. | Manufacture panels, install and finish agreed elements. |
| Completion | Obtain certificates and occupancy approval. | Inspect, test and hand over ARTSTONE’s scope. |
Project-specific design addresses wind, movement, anchors, fire stopping and weather resistance. The signed agreement allocates final responsibilities and exclusions.
The next step
Let’s define your project.
Share your land details, intended use and priorities. We will discuss the appropriate package with you and your registered contractor.