Design to handover
A clear route
to completion.
A defined brief, coordinated approvals and shared release points connect the client, registered contractor and ARTSTONE factory.

An interactive process guide
Your project.
Six coordinated stages.
Select a stage to explore the required information, the three parties’ roles, the deliverables and the release point. This is a process explainer, not live project tracking.
STAGE 01 / 06
Brief & studio selection
Define the land, intended building and architectural choices before developing the offer.

Information needed
What the stage produces
Where preparation can happen together
Two workstreams.
One coordinated release.
Factory preparation and site work can progress alongside each other when approved dependencies permit. Delivery brings the two streams together.
Approved design & release conditions
Client approval, coordinated drawings, scope and applicable production prerequisites.
Produce the approved package
- Confirm component and service details
- Manufacture and apply selected finishes
- Inspect and record component identity
- Protect, pack and prepare the load manifest
Prepare the receiving project
- Secure permits and coordinate statutory requirements
- Complete the agreed earthworks and interfaces
- Prepare access, receiving areas and work fronts
- Confirm site and delivery readiness
Dispatch & delivery coordination
Both component readiness and site readiness must meet the agreed criteria. Route, lifting, receiving and sequence arrangements are confirmed.
Review the logistics plan ↗Approved connections, installation checks and agreed service tests.
ARTSTONE records and care instructions, contractor approvals and client acceptance.
The quotation
A defined offer through your contractor.
- Design and measurementThe proposed design, carpet area and measurement basis, outdoor areas and amenities.
- Selections and fitted itemsArchitectural finishes, joinery, fittings and specified services.
- Factory and site scopeManufacturing, transport and assembly, with factory completion and site connection boundaries.
- Commercial conditionsRoles, milestones, dependencies, inclusions, exclusions and offer conditions.
Recorded changes
Approval before execution.
After design approval, a client change is submitted through the contractor. ARTSTONE reviews implications for components, scope, drawings, cost, programme and production. The revised proposal and documents require agreement before execution.
A change made during manufacture or installation may affect materials already prepared, delivery sequencing and site coordination. Written records keep the parties aligned with the latest approved scope.
Programme planning
An indicative target, not a universal promise.
The presentation sets an indicative ARTSTONE target of construction duration around one-third of comparable traditional construction. It is a planning ambition rather than a verified result for every building.
Actual duration depends on approved scope, engineering, permits, client decisions, factory release, site readiness and logistics. Transport and assembly still create site activity, and specialised trucks and cranes remain necessary.
Logistics and site delivery
Component delivery is part of the design.
Review component dimensions, packing, route feasibility, site access, receiving areas, cranes and assembly sequence together. Restricted access is resolved before manufacturing release, with responsibilities and dispatch checks documented for the project.
Explore the logistics plan →The next step