ARTSTONE
Home / Complete construction package

Complete construction package

A building prepared
as a coordinated system.

Structural elements, architectural surfaces and agreed building services are brought together for engineered site assembly.

Illustrative ARTSTONE architectural or product concept
Architectural / product concept

The component range

Concrete elements with a shared design.

  • Columns and beamsVertical and horizontal structural elements, reinforced and connected according to the engineering design.
  • Slabs and stairsFloor and roof elements, flights and landings, coordinated with the structural layout.
  • Walls and façade panelsStructural or partition applications, incorporating approved openings and the selected finish palette.
Illustrative ARTSTONE concept
Illustrative concept. Final details follow approved design.

Scope of supply

The complete building package.

Package areaItems that may be included
Structure and finishesPrecast columns, beams, slabs, stairs and wall panels, with selected architectural finishes.
Fabrication and joineryDoors, windows, metal components, kitchen countertops, cabinets and wardrobes.
Electrical and plumbingCoordinated electrical provisions, plumbing and sanitary systems with agreed site connections.
Mechanical and fire safetySpecified ventilation, cooling, fire safety installations and associated interfaces.
AutomationControls and automation included in the agreed specification.
Optional furnishingFurniture and furnishing can be discussed as an additional package.

The quotation defines inclusions, exclusions and the division between factory completion and site work. Items shown in an architectural concept are not automatically included in a contract.

Building services

Resolved before the concrete is cast.

Routes, conduits, outlets, distribution provisions and control positions follow the approved layout. Plumbing design coordinates fixture locations, pipework and connection points. Mechanical and fire safety provisions are specified for the intended building use.

This coordination reduces the need for destructive chasing and repeated changes after production. Service access, testing and completion responsibilities remain explicit in the project scope.

Illustrative ARTSTONE concept
Illustrative concept. Final details follow approved design.

Assembly

Engineered components, not an informal kit.

The LEGO-style description explains the assembly idea: separate prepared elements form a complete building. Actual structural behaviour depends on engineering, reinforcement, joints and permanent connections.

Manufacturing release follows approved drawings. Site readiness includes structural interfaces, access, unloading and lifting arrangements. Components are installed in the approved sequence with temporary support where required, then checked and connected before lifting support is released.

The next step

Let’s define your project.

Share your land details, intended use and priorities. We will discuss the appropriate package with you and your registered contractor.

Prepare your project brief ↗